Metal Building - Steel Building framing kits include:

Designed to be sheathed with your choice of steel, wood, shingles, or any other choice you desire.

  • Structural plans 
    (optional stamped version for your jurisdiction available, $500 charges apply)
  • Overhead door, man door, and window openings Framing package for your own windows and doors - Windows & doors not included, available for purchase
  • Complete structure including Post & Beam Framing
  • Foundation Post saddles for install when you pour your concrete footings
  • Rafters and or Trusses (as applicable)
  • Wall Girts
  • Roof, eve purlins
  • Kelly screws, strapping, brackets, post saddles
  • Instruction Guide

Available additional options (charges apply):

  • Steel or Vinyl Siding
  • Steel Roofing
  • Man doors
  • Overhead doors
  • Windows

DIY STEEL FRAMING KITS TERMS AND TIMELINE

For DIY kits, the timelines vary depending on the size and model chosen, timelines may be a bit longer for a Home kit vs a steel building kit. Timelines below are the standard procedure:

Stage 1- Drawings and Engineering (4-8 weeks ) 80% Payment required

  • Green Terra Homes will provide structural drawings (see details about what plans are provided HERE)
  • Site specific engineering and site reports as required (charges may apply see above)
  • Locks in next available manufacturing spot (Limited Spots Available)
  • Sign off on your layout and add-on choices if applicable

Stage 2-  Manufacturing (4-10 weeks)

  • Typically, 4-10 week once manufacturing begins depending on unit model and size and production queue
  • Any upgrades chosen or added must be paid in full at this time.

Stage 3 – Final 20% Payment and Shipping  (2-3 weeks)  

  • Payment is Required 2 weeks prior to shipping
  • Coordinate Shipping arrangements with Owner/Builders
  • Coordinate any tariffs and fees and duties if applicable
  • Allow time for delivery
  • Storage fee extra if required (if you need us to store the unit past 30 days)

To Reserve Your Spot in Production, we need:

  • A confirmed signed Order
  • Down Payment – 80%  of sale price will be required to start design and engineering and to secure production spot
  • If you miss the deadlines you will be bumped to the next available production spot

All time frames stated are dependent on decision making processes, destination, season, size and model. These timelines will vary for double wide units.